Hi
user
Admin Login:
Username:
Password:
Name:
A strategy for managing diverse equipment in the CERN controls group
--client
fosdem
--show
fosdem_2012
--room K1105_2012 209 --force
Next: 1 Why the community should welcome Average Jane and Joe
show more...
Marks
Author(s):
Juan David Gonzalez Cobas, Javier Serrano
Location
K.1.105
Date
feb Sun 05
Days Raw Files
Start
13:00
First Raw Start
error-in-template
Duration
00:50:00
Offset
None
End
13:50
Last Raw End
Chapters
Total cuts_time
None min.
raw-playlist
raw-mp4-playlist
encoded-files-playlist
mp4
svg
png
assets
release.pdf
A_strategy_for_managing_diverse_equipment_in_the_CERN_controls_group.json
logs
Admin:
episode
episode list
cut list
raw files day
marks day
marks day
image_files
State:
---------
borked
edit
encode
push to queue
post
richard
review 1
email
review 2
make public
tweet
to-miror
conf
done
Locked:
clear this to unlock
Locked by:
user/process that locked.
Start:
initially scheduled time from master, adjusted to match reality
Duration:
length in hh:mm:ss
Name:
Video Title (shows in video search results)
Emails:
email(s) of the presenter(s)
Released:
has someone authorised pubication
Unknown
Yes
No
Normalise:
Channelcopy:
m=mono, 01=copy left to right, 10=right to left, 00=ignore.
Thumbnail:
filename.png
Description:
markdown
The CERN accelerator control systems access equipment distributed over a geographic area tens of kilometers across. When off the shelf hardware is not available engineers design and prototype I/O devices as needed. With the advent of the open hardware repository, collaborations between the physics laboratories, research institutes and industry now ensure high quality designs and generality. The manufacture of these devices may be tendered out to industry and the companies involved are free to add them to their own catalogs. The control system requires very precise timing and synchronization of control and acquisition values over a large area and a diverse array of configurable equipment connected to the accelerators. Great care is required to manage the control system timing and configuration so that remote FPGA cores are set up correctly. The “White-Rabbit” timing project is open and addresses the future timing and synchronization needs for CERN and other laboratories. White-rabbit makes use of synchronous Ethernet and uses ideas from IEEE 1588 PTP protocol to synchronize remote equipment up to 10Km apart to better than one nanosecond. Various control system devices at different geographic locations will have on board FPGA logic loaded dynamically by carrier FMC device drivers with configuration data. Device specific drivers then scan the FPGA configuration via a Wishbone-standard bus to determine the installation and if any further configuration is needed. Etherbone is a software extension of the Wishbone hardware standard permitting remote FPGA cores to communicate with each other and with other control system components. The variety of I/O peripherals, their wide range of activation mode and the requirement to move several megabytes of data per channel per second is managed by ZIO, a new I/O framework designed to handle the usual I/O channels but also pulse generation and sampling; all peripherals may also be white-rabbit-aware, so that their own timestamps are more precise than what the host computer can offer. Although ZIO examples drive simple I/O channels, the system is able to DMA directly to user space, to sustain high data rates.
Comment:
production notes
Rf filename:
root is .../show/dv/location/, example: 2013-03-13/13:13:30.dv
Sequence:
get this:
check and save to add this
Veyepar
Video Eyeball Processor and Review